Library
Engineer-written notes on RIMX (process historian and real-time database), APC payback, OPC UA, MQTT, operator training and industrial AI. Written for people who run units — and structured so search engines can find them.
12 Nov 2026 · Energy
∑energy / ∑product only in production mode. A turnaround week is not a saving — and not an APC baseline.
12 Nov 2026 · Industrial data
A TSDB stores numbers. Plant history also needs OPC quality, operating mode and a tag owner on the unit.
12 Nov 2026 · Engineering insight
If loops hunt or sit on a limit, the multivariable controller will be put in manual. Audit the 8–15 MV loops first.
12 Nov 2026 · Industrial data
SME plants with Excel extracts need a working real-time database, not an enterprise historian they cannot staff.
12 Nov 2026 · Technical note
One unit, about 50–300 tags you already trend, and one report operations asked for — not the whole DCS.
12 Nov 2026 · Technical note
A workbook-only KPI is a copy-paste ritual. Calculate it from historian tags with a production-mode mask.
10 Nov 2026 · Industrial data & AI
Time-aligned tags, OPC status and operating mode are what models inherit. RIMX keeps that context so Python, KPIs and later AI stay honest.
10 Nov 2026 · Analytics
2024–2025 process-control papers treat multi-rate lab samples as the real problem. Build inferentials on historian tags, then show them next to the lab.
10 Nov 2026 · Industrial AI
Mode masks, a short tag list, and alerts that name the excursion — before a deep multivariate model on the whole DCS.
10 Nov 2026 · Integration
A Unified Namespace is live state. The historian is history. Use OPC UA for the DCS, MQTT for packages, REST for IT.
10 Nov 2026 · Industrial AI
NAMUR NE178 Verification of Request and Fraunhofer LLM4OPC: read-only retrieval first, human approval for any write.
10 Nov 2026 · Operator training
Turn trips, start-ups and golden batches in the historian into OTS scenarios crews will recognise.
10 Nov 2026 · Technical note
Specific energy, yield, quality sigma and utilisation from historian tags — integrate, then ratio, with a production-mode mask.
10 Nov 2026 · Engineering insight
Constraint, baseline, healthy PIDs and a named owner. Literature payback is months to two years; most applications fade without maintenance.
10 Nov 2026 · Integration guide
Certificates, SignAndEncrypt, read-only subscriptions and Historical Access — the DCS stays the controller.
Talk to an engineer, not a salesperson. Tell us about your unit and we will suggest where to start.